Cable Bolting Rig
ProductOverview
A cable bolting rig installs long flexible tendons of steel strand into rock to provide deep ground support where short rigid rock bolts are not enough. In underground mines the immediate roof can be held with resin or mechanical bolts a few meters long, but large open stopes, intersections, and weak ground need anchors that reach far beyond the loosened zone into competent rock. Cable bolts, typically 15.2 mm to 28 mm steel strand grouted into a drilled hole, do exactly that, tying the near-surface rock back to stable ground several meters away. The rig is a single self-contained machine that drills the hole, mixes and pumps the cement grout, pushes the cable strand up the hole, and sets the surface anchor, all from a protected operator station.
The machine combines the functions that would otherwise need a drill jumbo, a grout plant, and manual cable installation. It is built around a Carrier Chassis that trams the rig through the drives, a Positioning Boom that aims the drilling and cabling head at the roof or rib, and a Grout System that produces the cement column the cable is bonded into. Because cable bolting is slow and repetitive work performed under unsupported or partly supported ground, the rig is designed so the operator stays under a protective canopy for the entire cycle.
Carrier and tramming
The Carrier Chassis is a center-articulated four-wheel-drive diesel chassis. Articulation through the Articulation Joint lets the long machine negotiate the tight curves of mine drives, while the Drive Axle units use planetary final drives and enclosed wet-disc brakes that tolerate the dust, water, and grit underground. Power comes from a Flameproof Diesel Engine fitted with an intake Intake Flame Trap and an Exhaust Scrubber so the exhaust is cooled and cleaned before it enters the mine air. A Powershift Transmission with a torque converter gives smooth low-speed control for spotting the machine accurately under each row of holes. When drilling, the Stabilizer Leg legs are lowered to take the bounce out of the chassis so the feed stays steady.
Boom and feed
The Positioning Boom positions the drilling and cabling head. It slews, lifts, telescopes, and rolls over so the same head can drill a vertical roof hole, then tilt to feed cable, then reposition to a rib hole without the operator leaving the seat. The Drill Feed and Head is a chain-driven beam carrying a Rotation Head that turns the drill string. Flushing water enters the rotating string through the Water Swivel, clearing cuttings and suppressing dust. Holes are advanced with threaded Drill Rod sections coupled in series and a tungsten carbide Drill Bit at the toe. Hole length is the limiting design variable: a single-pass beam can drill to its own length, while telescoping and rod-extension arrangements reach 12 to 15 m.
Cable handling and anchoring
Once the hole is drilled, the Cable Handling System system takes over. Strand is paid out from a braked Cable Coil Dispenser, pulled through a Cable Straightener to remove the coil set, and driven up the hole by a friction Cable Pusher. When the cable reaches depth the Cable Shear shears it to length. At the collar a Bearing Plate spreads the load against the rock and a Barrel and Wedge grips the strand once the grout has cured and the cable is tensioned. Bulbed or birdcaged strand patterns may be used to improve the grip of the grout column along the cable.
Grout system
Bond between cable and rock comes from cement grout, and the Grout System is what distinguishes a true cable bolter from a plain drill. A Colloidal Mixer of the high-shear colloidal type produces a dense, stable grout at a controlled water-to-cement ratio, usually between 0.35 and 0.45. The grout is held in an Agitator Hopper hopper that keeps it moving so it does not settle, then a Grout Pump of the progressive cavity type meters it through a Grout Hose and Lance and lance to the bottom of the hole. Grouting from the toe upward, either before the cable goes in or through a breather tube, ensures the hole fills without trapped air voids that would leave the cable unbonded.
Hydraulics and controls
Almost every function on the rig is hydraulic. The Hydraulic Power Pack pack carries variable displacement piston pumps, a baffled reservoir, an oil cooler, and a Valve Bank of proportional valves that meter flow to the boom, feed, pushers, and pumps. The Electrical System system provides low-voltage power, work lighting, and a Machine Controller that coordinates engine speed, hydraulic demand, and the drilling sequence. The Operator Station sits under a falling-object protective Protective Canopy with a Control Console and a Operator Display so the whole cycle is run from one seat.
Maintenance and variants
Wear concentrates in the grout path: the PC Pump Stator and PC Pump Rotor of the pump abrade against cement and are treated as routine replacement items, and the Grout Hose and Lance is flushed at the end of every shift to stop it setting solid. Drill consumables, the Drill Bit and rod threads, wear with rock hardness. Variants exist for very low seams, where the machine is built long and flat, and for large open stopes, where extended booms and longer cable capacity matter more than a compact profile. Some rigs add automated rod handling and a strand magazine to cut the manual work in a cycle that is otherwise one of the slower tasks in the mining sequence.
Cable Bolting Rig parts and their functions
8 top-level parts · 261 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Carrier Chassis 8 parts | 1× | Articulated diesel carrier chassis |
| 2 | Positioning Boom 7 parts | 1× | Hydraulic positioning boom |
| 3 | Drill Feed and Head 8 parts | 1× | Drill feed and rotation head |
| 4 | Cable Handling System 6 parts | 1× | Cable coil dispenser and pusher |
| 5 | Grout System 6 parts | 1× | Colloidal grout mixer and pump |
| 6 | Hydraulic Power Pack 6 parts | 1× | Hydraulic power pack |
| 7 | Operator Station 5 parts | 1× | Canopy-protected operator cabin |
| 8 | Electrical System 7 parts | 1× | Electrical and control system |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labourTap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cable Bolting Rig
8 top-level lines · 96 rows shown · 261 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Carrier Chassis 8 parts | mine-cable-bolter-carrier | 1× | 1 | 65 | assembly |
| 1.1 | Articulated Chassis Frame | mine-cable-bolter-chassis-frame | 1× | 1 | · | part |
| 1.2 | Articulation Joint 4 parts | mine-cable-bolter-articulation-joint | 1× | 1 | 10 | assembly |
| 1.2.1 | Pivot Pin | mine-cable-bolter-pivot-pin | 2× | 2 | · | part |
| 1.2.2 | Steering Cylinder | mine-cable-bolter-steer-ram | 2× | 2 | · | part |
| 1.2.3 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
| 1.2.4 | Oil Seal | oil-seal | 4× | 4 | · | part |
| 1.3 | Flameproof Diesel Engine 6 parts | mine-cable-bolter-diesel-engine | 1× | 1 | 8 | assembly |
| 1.3.1 | Engine Block | mine-cable-bolter-engine-block | 1× | 1 | · | part |
| 1.3.2 | Intake Flame Trap | mine-cable-bolter-flame-trap | 1× | 1 | · | part |
| 1.3.3 | Fuel Injection Set | mine-cable-bolter-fuel-injection | 1× | 1 | · | part |
| 1.3.4 | Engine Radiator | mine-cable-bolter-engine-radiator | 1× | 1 | · | part |
| 1.3.5 | Oil Seal | oil-seal | 3× | 3 | · | part |
| 1.3.6 | Fastener Set | fastener-set | 1× | 1 | · | part |
| 1.4 | Powershift Transmission 5 parts | mine-cable-bolter-transmission | 1× | 1 | 11 | assembly |
| 1.4.1 | Torque Converter | mine-cable-bolter-torque-converter | 1× | 1 | · | part |
| 1.4.2 | Helical Gear Pair | gear-pair | 2× | 2 | · | part |
| 1.4.3 | Gearbox Housing | gearbox-housing | 1× | 1 | · | part |
| 1.4.4 | Ball Bearing | ball-bearing | 4× | 4 | · | part |
| 1.4.5 | Oil Seal | oil-seal | 3× | 3 | · | part |
| 1.5 | Drive Axle 6 parts | mine-cable-bolter-axle | 2× | 2 | 14 | assembly |
| 1.5.1 | Axle Housing | mine-cable-bolter-axle-housing | 1× | 2 | · | part |
| 1.5.2 | Planetary Hub | mine-cable-bolter-planetary-hub | 2× | 4 | · | part |
| 1.5.3 | Wet Disc Brake | mine-cable-bolter-wet-brake | 2× | 4 | · | part |
| 1.5.4 | Helical Gear Pair | gear-pair | 1× | 2 | · | part |
| 1.5.5 | Ball Bearing | ball-bearing | 4× | 8 | · | part |
| 1.5.6 | Oil Seal | oil-seal | 4× | 8 | · | part |
| 1.6 | Mining Wheel | mine-cable-bolter-wheel | 4× | 4 | · | part |
| 1.7 | Stabilizer Leg | mine-cable-bolter-stabilizer | 2× | 2 | · | part |
| 1.8 | Exhaust Scrubber | mine-cable-bolter-exhaust-scrubber | 1× | 1 | · | part |
| 2 | Positioning Boom 7 parts | mine-cable-bolter-boom | 1× | 1 | 9 | assembly |
| 2.1 | Boom Base | mine-cable-bolter-boom-base | 1× | 1 | · | part |
| 2.2 | Telescoping Boom Arm | mine-cable-bolter-boom-arm | 1× | 1 | · | part |
| 2.3 | Lift Cylinder | mine-cable-bolter-lift-cylinder | 2× | 2 | · | part |
| 2.4 | Slew Cylinder | mine-cable-bolter-slew-cylinder | 1× | 1 | · | part |
| 2.5 | Feed Roll-Over | mine-cable-bolter-roll-over | 1× | 1 | · | part |
| 2.6 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
| 2.7 | Fastener Set | fastener-set | 1× | 1 | · | part |
| 3 | Drill Feed and Head 8 parts | mine-cable-bolter-feed | 1× | 1 | 18 | assembly |
| 3.1 | Feed Beam | mine-cable-bolter-feed-beam | 1× | 1 | · | part |
| 3.2 | Feed Chain | mine-cable-bolter-feed-chain | 1× | 1 | · | part |
| 3.3 | Feed Motor | mine-cable-bolter-feed-motor | 1× | 1 | · | part |
| 3.4 | Rotation Head 5 parts | mine-cable-bolter-rotation-head | 1× | 1 | 8 | assembly |
| 3.4.1 | Rotation Motor | mine-cable-bolter-rotation-motor | 1× | 1 | · | part |
| 3.4.2 | Helical Gear Pair | gear-pair | 1× | 1 | · | part |
| 3.4.3 | Gearbox Housing | gearbox-housing | 1× | 1 | · | part |
| 3.4.4 | Ball Bearing | ball-bearing | 3× | 3 | · | part |
| 3.4.5 | Oil Seal | oil-seal | 2× | 2 | · | part |
| 3.5 | Drill Chuck | mine-cable-bolter-chuck | 1× | 1 | · | part |
| 3.6 | Water Swivel | mine-cable-bolter-water-swivel | 1× | 1 | · | part |
| 3.7 | Drill Rod | mine-cable-bolter-drill-rod | 4× | 4 | · | part |
| 3.8 | Drill Bit | mine-cable-bolter-drill-bit | 1× | 1 | · | part |
| 4 | Cable Handling System 6 parts | mine-cable-bolter-cable-handling | 1× | 1 | 19 | assembly |
| 4.1 | Cable Coil Dispenser | mine-cable-bolter-cable-coil | 1× | 1 | · | part |
| 4.2 | Cable Straightener | mine-cable-bolter-cable-straightener | 1× | 1 | · | part |
| 4.3 | Cable Pusher | mine-cable-bolter-cable-pusher | 1× | 1 | · | part |
| 4.4 | Cable Shear | mine-cable-bolter-cable-cutter | 1× | 1 | · | part |
| 4.5 | Barrel and Wedge | mine-cable-bolter-barrel-wedge | 10× | 10 | · | part |
| 4.6 | Bearing Plate | mine-cable-bolter-faceplate | 5× | 5 | · | part |
| 5 | Grout System 6 parts | mine-cable-bolter-grout-system | 1× | 1 | 12 | assembly |
| 5.1 | Colloidal Mixer | mine-cable-bolter-grout-mixer | 1× | 1 | · | part |
| 5.2 | Agitator Hopper | mine-cable-bolter-grout-agitator | 1× | 1 | · | part |
| 5.3 | Grout Pump 5 parts | mine-cable-bolter-grout-pump | 1× | 1 | 7 | assembly |
| 5.3.1 | PC Pump Rotor | mine-cable-bolter-pc-rotor | 1× | 1 | · | part |
| 5.3.2 | PC Pump Stator | mine-cable-bolter-pc-stator | 1× | 1 | · | part |
| 5.3.3 | Pump Drive Motor | mine-cable-bolter-pump-drive | 1× | 1 | · | part |
| 5.3.4 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
| 5.3.5 | Oil Seal | oil-seal | 2× | 2 | · | part |
| 5.4 | Water Tank | mine-cable-bolter-water-tank | 1× | 1 | · | part |
| 5.5 | Grout Hose and Lance | mine-cable-bolter-grout-hose | 1× | 1 | · | part |
| 5.6 | Pressure Sensor | pressure-sensor | 1× | 1 | · | part |
| 6 | Hydraulic Power Pack 6 parts | mine-cable-bolter-hydraulic-power | 1× | 1 | 8 | assembly |
| 6.1 | Hydraulic Pump | mine-cable-bolter-hyd-pump | 2× | 2 | · | part |
| 6.2 | Hydraulic Reservoir | mine-cable-bolter-hyd-tank | 1× | 1 | · | part |
| 6.3 | Valve Bank | mine-cable-bolter-valve-bank | 1× | 1 | · | part |
| 6.4 | Oil Cooler | mine-cable-bolter-hyd-cooler | 1× | 1 | · | part |
| 6.5 | Hydraulic Filter | mine-cable-bolter-hyd-filter | 2× | 2 | · | part |
| 6.6 | Accumulator | mine-cable-bolter-accumulator | 1× | 1 | · | part |
| 7 | Operator Station 5 parts | mine-cable-bolter-operator-station | 1× | 1 | 5 | assembly |
| 7.1 | Protective Canopy | mine-cable-bolter-canopy | 1× | 1 | · | part |
| 7.2 | Operator Seat | mine-cable-bolter-seat | 1× | 1 | · | part |
| 7.3 | Control Console | mine-cable-bolter-control-console | 1× | 1 | · | part |
| 7.4 | Operator Display | mine-cable-bolter-display | 1× | 1 | · | part |
| 7.5 | Dust Suppression | mine-cable-bolter-dust-suppression | 1× | 1 | · | part |
| 8 | Electrical System 7 parts | mine-cable-bolter-electrical | 1× | 1 | 125 | assembly |
| 8.1 | Machine Controller 4 parts | mine-cable-bolter-controller | 1× | 1 | 88 | assembly |
| 8.1.1 | Bare PCB | pcb-bare | 1× | 1 | · | part |
| 8.1.2 | Microcontroller | mcu | 1× | 1 | · | part |
| 8.1.3 | SMD Passive (R/C/L) | smd-passives | 80× | 80 | · | part |
| 8.1.4 | Connector | connector | 6× | 6 | · | part |
| 8.2 | Starting Battery | mine-cable-bolter-battery | 1× | 1 | · | part |
| 8.3 | Alternator | mine-cable-bolter-alternator | 1× | 1 | · | part |
| 8.4 | Wire Bundle | wire-bundle | 1× | 1 | · | part |
| 8.5 | Connector | connector | 20× | 20 | · | part |
| 8.6 | LED Work Light | mine-cable-bolter-light | 6× | 6 | · | part |
| 8.7 | Relay | relay | 8× | 8 | · | part |
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $200k–$5M. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| caterpillar.com ↗ | Irving, US | Construction & mining equipment | made to order | 20–36 wks |
|
🇯🇵Komatsu
komatsu.com ↗
|
Tokyo, JP | Construction & mining equipment | made to order | 20–36 wks |
|
🇸🇪Sandvik
rocktechnology.sandvik ↗
|
Stockholm, SE | Mining & rock technology | made to order | 20–36 wks |
|
🇸🇪Epiroc
epiroc.com ↗
|
Stockholm, SE | Mining & drilling equipment | made to order | 20–36 wks |
|
🇫🇮Metso
metso.com ↗
|
Helsinki, FI | Crushing & minerals processing | made to order | 20–36 wks |
1,029-word article