Mechanized Scaling Rig

Product

Overview

A mechanized scaling rig removes loose and fractured rock from the roof, called the back, and the walls of an underground excavation before workers and equipment move in. After a blast the freshly exposed rock is full of cracks, and slabs hang ready to fall. Hand scaling with a bar is slow and puts a person directly under the hazard. This rig does the same job from a protected cab: a heavy steel pick on a long articulated boom pries the loose rock down while the operator sits behind a falling-object canopy, set back from the fall zone.

The machine is built around four things working together. The Carrier Chassis drives the rig to the face and plants it. The Scaling Boom reaches the pick up to the back and out along the walls. The Scaling Head carries the pick and, when rock will not come down by prying, a hydraulic breaker. The Operator Cab keeps the operator safe from the material the rig is deliberately bringing down. A Hydraulic System pack powers every motion and a Electrical System system lights the face and runs the controls.

Carrier and chassis

The Carrier Chassis is an articulated wheeled frame split into a Front Frame Section and a Rear Frame Section joined by a Articulation Joint. Two Steering Cylinder units bend the frame to steer, which lets a long machine turn inside tight drifts where a fixed-frame vehicle could not. Drive comes from a Diesel Engine of around 75 kW, fitted with a Exhaust Catalytic Scrubber because the engine runs in confined air. Power passes through a Powershift Transmission to two Drive Axle units with planetary hubs and wet disc brakes, then to four Wheel & Tire assemblies on foam-filled tires that cannot go flat on sharp muck. Before scaling, four Stabilizer Leg outriggers drop and plant the rig so the boom reactions do not rock it.

Scaling boom

The Scaling Boom is the reach of the machine. It is a three-section weldment in abrasion-resistant plate: a Boom Base Section, a Boom Mid Section, and a telescoping Telescoping Boom Tip that extends the last stretch to the rock. A Slew Ring Bearing swings the whole boom left and right. A Lift Cylinder raises and lowers it, a Extension Cylinder pushes the tip out, and a Head Tilt Cylinder angles the head against the surface. The joints ride on hardened Boom Pivot Pin pins turning in bronze Boom Pivot Bushing bushings, which take the shock of repeated prying without seizing. Reach is typically 8 to 9 m up and 9 to 10 m out, enough to scale the back of a large heading from a single setup.

Scaling head

The Scaling Head is where the work happens. The primary tool is the Scaling Pick, a forged spike held in a Pick Holder Block. The operator drives the pick into a crack behind a loose slab and levers it free with the boom. A Head Rotator turns the head so the pick can attack a crack from the best angle. When a slab is keyed in too tightly to pry, the Hydraulic Breaker, a hydraulic impact hammer, delivers 1,200 to 1,700 J per blow through a Breaker Moil Point to crack it loose. For sheeting that peels off a face in flat layers, a Scaling Rake combs the loose material down in one pass. The head mounts on hardened Head Mount Pin pins.

Operator cab

The Operator Cab is the safety case of the whole machine. Its job is to protect the operator from the very rock the rig is knocking down. A FOPS Canopy rated to ISO 3449 stops falling objects, and the ROPS Cab Frame meets ROPS standard ISO 3471 against a rollover. Inside, a Suspension Seat on a sprung Coil Spring suspension isolates the operator from the jolts of breaking, and two Control Joystick controllers work the boom and head. The cab sits offset from the boom centerline so the operator is never directly beneath the fall zone, and laminated Laminated Cab Glass gives a clear view of the face while a Cab HVAC Unit unit keeps the air breathable in deep, hot workings.

Hydraulics and electrical

The Hydraulic System pack supplies every cylinder and motor on the machine. A variable Variable Displacement Pump draws from the Hydraulic Tank and feeds a Proportional Valve Bank of proportional spools that meter oil to the boom, head, steering, and outriggers. System pressure runs 210 to 250 bar, watched by Pressure Sensor units, and a Oil Cooler sheds the heat of continuous breaking. The Electrical System system is 24 V: a Machine Control Unit coordinates the functions, a 12 V Battery pair and Alternator supply power, and six LED Work Light lamps flood the face so the operator can read the rock.

Variants and use

A scaling cycle is straightforward. The operator trams in, drops the Stabilizer Leg outriggers, and works the pick across the back and walls from one corner to the other, prying down every loose slab and switching to the Hydraulic Breaker for the stubborn ones. Smaller rigs ride on a compact articulated carrier for narrow-vein mines, while larger units carry a longer Scaling Boom for wide-heading metal mines and big civil tunnels. Some are built tracked instead of wheeled for very rough or steep ground. Across the range the purpose stays the same: take a person out from under the loose rock and put a steel pick there instead.

Mechanized Scaling Rig parts and their functions

6 top-level parts · 530 parts in total · full bill of materials below
Mechanized Scaling Rig parts diagram: 1 carrier chassis, 2 scaling boom, 3 scaling head, 4 operator cab, 5 hydraulic system, 6 electrical system. 530 parts in 6 assemblies.
Mechanized Scaling Rig parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Carrier Chassis 10 parts Self-propelled chassis
2 Scaling Boom 9 parts Articulated scaling boom
3 Scaling Head 7 parts Scaling tool at the boom tip
4 Operator Cab 8 parts FOPS/ROPS operator station
5 Hydraulic System 7 parts Hydraulic power and actuation
6 Electrical System 8 parts 24 V electrics, lighting, controls

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Mechanized Scaling Rig

6 top-level lines · 137 rows shown · 530 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Carrier Chassis 10 parts mine-scaler-carrier 1 149 assembly
1.1 Front Frame Section mine-scaler-frame-front 1 · part
1.2 Rear Frame Section mine-scaler-frame-rear 1 · part
1.3 Articulation Joint 4 parts mine-scaler-articulation-joint 1 19 assembly
1.3.1 Articulation Pivot Pin mine-scaler-pivot-pin 2 · part
1.3.2 Pivot Bushing mine-scaler-pivot-bushing 4 · part
1.3.3 Steering Cylinder 5 parts + deeper › mine-scaler-steer-cylinder 2 6 assembly
1.3.4 Fastener Set fastener-set 1 · part
1.4 Diesel Engine 8 parts mine-scaler-diesel-engine 1 15 assembly
1.4.1 Engine Block mine-scaler-engine-block 1 · part
1.4.2 Cylinder Head mine-scaler-cylinder-head 1 · part
1.4.3 Turbocharger mine-scaler-turbocharger 1 · part
1.4.4 Fuel Injector mine-scaler-fuel-injector 4 · part
1.4.5 Engine Radiator mine-scaler-radiator 1 · part
1.4.6 Starter Motor mine-scaler-starter 1 · part
1.4.7 Drive Belt drive-belt 2 · part
1.4.8 Oil Seal oil-seal 4 · part
1.5 Drive Axle 6 parts mine-scaler-axle 2 26 assembly
1.5.1 Axle Housing mine-scaler-axle-housing 2 · part
1.5.2 Differential 3 parts + deeper › mine-scaler-differential 2 5 assembly
1.5.3 Planetary Wheel Hub 3 parts + deeper › mine-scaler-planetary-hub 4 5 assembly
1.5.4 Wet Disc Brake mine-scaler-wet-brake 4 · part
1.5.5 Ball Bearing ball-bearing 8 · part
1.5.6 Oil Seal oil-seal 8 · part
1.6 Wheel & Tire 3 parts mine-scaler-wheel 4 3 assembly
1.6.1 Steel Rim mine-scaler-rim 4 · part
1.6.2 Solid Mining Tire mine-scaler-tire 4 · part
1.6.3 Fastener Set fastener-set 4 · part
1.7 Powershift Transmission 5 parts mine-scaler-transmission 1 15 assembly
1.7.1 Helical Gear Pair gear-pair 4 · part
1.7.2 Gearbox Housing gearbox-housing 1 · part
1.7.3 Torque Converter mine-scaler-torque-converter 1 · part
1.7.4 Ball Bearing ball-bearing 6 · part
1.7.5 Oil Seal oil-seal 3 · part
1.8 Fuel Tank mine-scaler-fuel-tank 1 · part
1.9 Exhaust Catalytic Scrubber mine-scaler-exhaust-scrubber 1 · part
1.10 Stabilizer Leg 3 parts mine-scaler-stabilizer-leg 4 8 assembly
1.10.1 Stabilizer Cylinder 5 parts + deeper › mine-scaler-stab-cylinder 4 6 assembly
1.10.2 Ground Pad mine-scaler-stab-pad 4 · part
1.10.3 Articulation Pivot Pin mine-scaler-pivot-pin 4 · part
2 Scaling Boom 9 parts mine-scaler-boom 1 42 assembly
2.1 Boom Base Section mine-scaler-boom-base 1 · part
2.2 Boom Mid Section mine-scaler-boom-mid 1 · part
2.3 Telescoping Boom Tip mine-scaler-boom-tip 1 · part
2.4 Slew Ring Bearing 3 parts mine-scaler-slew-bearing 1 3 assembly
2.4.1 Ball Bearing ball-bearing 1 · part
2.4.2 Helical Gear Pair gear-pair 1 · part
2.4.3 Slew Hydraulic Motor mine-scaler-slew-motor 1 · part
2.5 Lift Cylinder 5 parts mine-scaler-lift-cylinder 1 6 assembly
2.5.1 Cylinder Tube mine-scaler-cyl-tube 1 · part
2.5.2 Cylinder Rod mine-scaler-cyl-rod 1 · part
2.5.3 Cylinder Piston mine-scaler-cyl-piston 1 · part
2.5.4 O-Ring Set oring-set 1 · part
2.5.5 Oil Seal oil-seal 2 · part
2.6 Extension Cylinder 5 parts mine-scaler-extend-cylinder 1 6 assembly
2.6.1 Cylinder Tube mine-scaler-cyl-tube 1 · part
2.6.2 Cylinder Rod mine-scaler-cyl-rod 1 · part
2.6.3 Cylinder Piston mine-scaler-cyl-piston 1 · part
2.6.4 O-Ring Set oring-set 1 · part
2.6.5 Oil Seal oil-seal 2 · part
2.7 Head Tilt Cylinder 5 parts mine-scaler-tilt-cylinder 1 6 assembly
2.7.1 Cylinder Tube mine-scaler-cyl-tube 1 · part
2.7.2 Cylinder Rod mine-scaler-cyl-rod 1 · part
2.7.3 Cylinder Piston mine-scaler-cyl-piston 1 · part
2.7.4 O-Ring Set oring-set 1 · part
2.7.5 Oil Seal oil-seal 2 · part
2.8 Boom Pivot Pin mine-scaler-boom-pin 6 · part
2.9 Boom Pivot Bushing mine-scaler-boom-bushing 12× 12 · part
3 Scaling Head 7 parts mine-scaler-head 1 21 assembly
3.1 Scaling Pick mine-scaler-pick 1 · part
3.2 Pick Holder Block mine-scaler-pick-holder 1 · part
3.3 Hydraulic Breaker 5 parts mine-scaler-breaker 1 7 assembly
3.3.1 Breaker Striker Piston mine-scaler-breaker-piston 1 · part
3.3.2 Breaker Moil Point mine-scaler-breaker-tool 1 · part
3.3.3 Gas Accumulator mine-scaler-accumulator 1 · part
3.3.4 O-Ring Set oring-set 2 · part
3.3.5 Oil Seal oil-seal 2 · part
3.4 Scaling Rake mine-scaler-rake 1 · part
3.5 Head Rotator 4 parts mine-scaler-head-rotator 1 5 assembly
3.5.1 Helical Gear Pair gear-pair 1 · part
3.5.2 Ball Bearing ball-bearing 2 · part
3.5.3 Slew Hydraulic Motor mine-scaler-slew-motor 1 · part
3.5.4 Oil Seal oil-seal 1 · part
3.6 Head Mount Pin mine-scaler-head-pin 2 · part
3.7 Boom Pivot Bushing mine-scaler-boom-bushing 4 · part
4 Operator Cab 8 parts mine-scaler-cab 1 87 assembly
4.1 FOPS Canopy mine-scaler-fops-canopy 1 · part
4.2 ROPS Cab Frame mine-scaler-cab-frame 1 · part
4.3 Suspension Seat 3 parts mine-scaler-seat 1 4 assembly
4.3.1 Coil Spring coil-spring 2 · part
4.3.2 Seat Cushion mine-scaler-seat-cushion 1 · part
4.3.3 Seat Frame mine-scaler-seat-frame 1 · part
4.4 Control Joystick 4 parts mine-scaler-joystick 2 34 assembly
4.4.1 Bare PCB pcb-bare 2 · part
4.4.2 Microcontroller mcu 2 · part
4.4.3 SMD Passive (R/C/L) smd-passives 30× 60 · part
4.4.4 Connector connector 4 · part
4.5 Laminated Cab Glass mine-scaler-cab-glass 3 · part
4.6 Cab HVAC Unit 3 parts mine-scaler-hvac 1 3 assembly
4.6.1 Heating Element heating-element 1 · part
4.6.2 Drive Belt drive-belt 1 · part
4.6.3 Cab Blower Fan mine-scaler-blower 1 · part
4.7 Sheet Metal Panel sheet-panel 6 · part
4.8 Fastener Set fastener-set 1 · part
5 Hydraulic System 7 parts mine-scaler-hydraulics 1 37 assembly
5.1 Variable Displacement Pump 4 parts mine-scaler-hyd-pump 1 6 assembly
5.1.1 Helical Gear Pair gear-pair 1 · part
5.1.2 Ball Bearing ball-bearing 2 · part
5.1.3 O-Ring Set oring-set 1 · part
5.1.4 Oil Seal oil-seal 2 · part
5.2 Hydraulic Tank mine-scaler-hyd-tank 1 · part
5.3 Proportional Valve Bank 4 parts mine-scaler-valve-bank 1 22 assembly
5.3.1 Valve Spool mine-scaler-valve-spool 8 · part
5.3.2 Pressure Relief Valve mine-scaler-relief-valve 4 · part
5.3.3 O-Ring Set oring-set 2 · part
5.3.4 Connector connector 8 · part
5.4 Return Filter mine-scaler-hyd-filter 2 · part
5.5 Oil Cooler mine-scaler-hyd-cooler 1 · part
5.6 Hydraulic Hose Set mine-scaler-hose-set 1 · part
5.7 Pressure Sensor pressure-sensor 4 · part
6 Electrical System 8 parts mine-scaler-electrical 1 194 assembly
6.1 Machine Control Unit 5 parts mine-scaler-control-unit 1 128 assembly
6.1.1 Bare PCB pcb-bare 1 · part
6.1.2 Microcontroller mcu 2 · part
6.1.3 SMD Passive (R/C/L) smd-passives 120× 120 · part
6.1.4 Power Supply power-supply 1 · part
6.1.5 Relay relay 4 · part
6.2 12 V Battery mine-scaler-battery 2 · part
6.3 Alternator 3 parts mine-scaler-alternator 1 24 assembly
6.3.1 Stator Assembly 3 parts + deeper › stator-assembly 1 3 assembly
6.3.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1 19 assembly
6.3.3 Ball Bearing ball-bearing 2 · part
6.4 LED Work Light mine-scaler-led-light 6 · part
6.5 Fuse & Relay Box mine-scaler-fuse-box 1 · part
6.6 Wire Bundle wire-bundle 1 · part
6.7 Relay relay 8 · part
6.8 Connector connector 24× 24 · part

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $200k–$5M. How estimates work
VendorHQSpecialtyMOQLead time
🇺🇸Caterpillar
caterpillar.com ↗
Irving, US Construction & mining equipment made to order 20–36 wks
🇯🇵Komatsu
komatsu.com ↗
Tokyo, JP Construction & mining equipment made to order 20–36 wks
🇸🇪Sandvik
rocktechnology.sandvik ↗
Stockholm, SE Mining & rock technology made to order 20–36 wks
🇸🇪Epiroc
epiroc.com ↗
Stockholm, SE Mining & drilling equipment made to order 20–36 wks
🇫🇮Metso
metso.com ↗
Helsinki, FI Crushing & minerals processing made to order 20–36 wks

983-word article