BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Electrical System

Assembly

Power distribution, motor starters, and PLC control. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Electrical System parts and their functions

5 top-level parts · 8 parts in total · full bill of materials below
Electrical System parts diagram: 1 substation, 2 motor starter, 3 PLC, 4 emergency stop, 5 cable reel. 8 parts in 5 top-level items.
Electrical System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Substation 1× Transformer and disconnect switch
2 Motor Starter 4× Soft-starters for bucket, slew, hoist, travel motors
3 PLC 1× Programmable controller managing sequences
4 Emergency Stop 1× Remote emergency stop button set
5 Cable Reel 1× Motorized or manual reel for power cable unwinding

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Electrical System

5 top-level lines · 5 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Substation bridge-stacker-reclaimer-substation 1× 1 · part
2 Motor Starter bridge-stacker-reclaimer-motor-starter 4× 4 · part
3 PLC bridge-stacker-reclaimer-plc 1× 1 · part
4 Emergency Stop bridge-stacker-reclaimer-emergency-stop 1× 1 · part
5 Cable Reel bridge-stacker-reclaimer-cable-reel 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the electrical system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks