Tailings System
AssemblyThe underflow outlet and control valve that discharge unfloated gangue at a rate set to hold the slurry-froth interface at the right level. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Tailings System parts and their functions
4 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Tailings Outlet Cone | 1× | Bottom cone outlet |
| 2 | Control Valve | 1× | Tailings dart/pinch valve |
| 3 | Interface Level Sensor | 2× | Interface level |
| 4 | Flow Meter | 1× | Tailings flow |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Tailings System
4 top-level lines · 4 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tailings Outlet Cone | column-flotation-cell-tailings-outlet | 1× | 1 | · | part |
| 2 | Control Valve | column-flotation-cell-control-valve | 1× | 1 | · | part |
| 3 | Interface Level Sensor | column-flotation-cell-level-sensor | 2× | 2 | · | part |
| 4 | Flow Meter | column-flotation-cell-flow-meter | 1× | 1 | · | part |
Where the tailings system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |