BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Marking System

Assembly

The reference scribe or LED display that transfers the logged orientation onto the recovered core. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Marking System parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Marking System parts diagram: 1 reference scribe, 2 toolface LED ring, 3 orientation line, 4 core marker. 4 parts in 4 assemblies.
Marking System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Reference Scribe Reference scribe
2 Toolface LED Ring Toolface LED ring
3 Orientation Line Orientation reference line
4 Core Marker Core marker

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Marking System

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Reference Scribe core-orientation-tool-scribe 1 · part
2 Toolface LED Ring core-orientation-tool-led-ring 1 · part
3 Orientation Line core-orientation-tool-orient-line 1 · part
4 Core Marker core-orientation-tool-marker-pen 1 · part

Where the marking system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks