Filter Bag Assembly
AssemblyHundreds of fabric bags in cylindrical shape trapping dust particles. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Filter Bag Assembly parts and their functions
4 top-level parts · 203 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Filter Bag | 200× | Individual filter bag (typical count) |
| 2 | Bag Fabric | 1× | Polyester, glass fiber, or PTFE membrane fabric |
| 3 | Bag Collar | 1× | Reinforced opening at top of bag |
| 4 | Bag Internal Cage | 1× | Internal cage preventing bag collapse |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Filter Bag Assembly
4 top-level lines · 4 rows shown · 203 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Filter Bag | dust-collector-baghouse-bag | 200× | 200 | · | part |
| 2 | Bag Fabric | dust-collector-baghouse-bag-material | 1× | 1 | · | part |
| 3 | Bag Collar | dust-collector-baghouse-bag-collar | 1× | 1 | · | part |
| 4 | Bag Internal Cage | dust-collector-baghouse-bag-cage | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the filter bag assembly is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |