Control System
AssemblyElectrical panel managing pulse-jet timing, fan operation, and alarms. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Control System parts and their functions
6 top-level parts · 6 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | PLC | 1× | Logic controller managing pulse sequence |
| 2 | Timer | 1× | Pulse-jet trigger timer (adjustable 10–60 second intervals) |
| 3 | Pressure Switch | 1× | Differential pressure sensor detecting bag clogging |
| 4 | Motor Starter | 1× | Fan motor soft-start or contactor |
| 5 | Alarm Lamp | 1× | High-pressure alarm indicator |
| 6 | Emergency Stop | 1× | Red button for immediate shutdown |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Control System
6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | PLC | dust-collector-baghouse-plc | 1× | 1 | · | part |
| 2 | Timer | dust-collector-baghouse-timer | 1× | 1 | · | part |
| 3 | Pressure Switch | dust-collector-baghouse-pressure-switch | 1× | 1 | · | part |
| 4 | Motor Starter | dust-collector-baghouse-motor-starter | 1× | 1 | · | part |
| 5 | Alarm Lamp | dust-collector-baghouse-alarm-lamp | 1× | 1 | · | part |
| 6 | Emergency Stop | dust-collector-baghouse-emergency-stop | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the control system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |