BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Column Vessel

Assembly

The vertical pressure vessel that holds the carbon bed while hot caustic eluate flows up through it. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Column Vessel parts and their functions

8 top-level parts · 10 parts in total · full bill of materials below
Column Vessel parts diagram: 1 pressure shell, 2 top retention screen, 3 bottom distributor screen, 4 vessel flange, 5 insulation jacket, 6 relief valve, 7 o-ring set, 8 fastener set. 10 parts in 8 top-level items.
Column Vessel parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Pressure Shell 1× Stainless pressure shell
2 Top Retention Screen 1× Top retention screen
3 Bottom Distributor Screen 1× Bottom distributor screen
4 Vessel Flange 2× Top and bottom flanges
5 Insulation Jacket 1× Mineral-wool insulation jacket
6 Relief Valve 1× Pressure relief valve
7 O-Ring Set 2× Flange seals
8 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Column Vessel

8 top-level lines · 8 rows shown · 10 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Pressure Shell gold-elution-column-shell 1× 1 · part
2 Top Retention Screen gold-elution-column-top-screen 1× 1 · part
3 Bottom Distributor Screen gold-elution-column-bottom-screen 1× 1 · part
4 Vessel Flange gold-elution-column-flange 2× 2 · part
5 Insulation Jacket gold-elution-column-insulation 1× 1 · part
6 Relief Valve gold-elution-column-relief-valve 1× 1 · part
7 O-Ring Set oring-set 2× 2 · part
8 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the column vessel is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks