BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Evaporator (Chiller)

Assembly

Flooded shell-and-tube evaporator chilling the service water. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Evaporator (Chiller) parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Evaporator (Chiller) parts diagram: 1 evaporator shell, 2 evaporator tubes, 3 evaporator tube plate, 4 evaporator baffle, 5 refrigerant distributor. 6 parts in 5 top-level items.
Evaporator (Chiller) parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Evaporator Shell 1× Evaporator shell
2 Evaporator Tubes 1× Evaporator tube bundle
3 Evaporator Tube Plate 2× Tube sheets
4 Evaporator Baffle 1× Internal baffle
5 Refrigerant Distributor 1× Refrigerant distributor

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Evaporator (Chiller)

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Evaporator Shell mine-cooling-plant-evap-shell 1× 1 · part
2 Evaporator Tubes mine-cooling-plant-evap-tubes 1× 1 · part
3 Evaporator Tube Plate mine-cooling-plant-evap-tube-plate 2× 2 · part
4 Evaporator Baffle mine-cooling-plant-evap-baffle 1× 1 · part
5 Refrigerant Distributor mine-cooling-plant-evap-distributor 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the evaporator (chiller) is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks