BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r107431 of this page, not the current version. Go to current · history

Rope System

Assembly

Head ropes carrying the conveyances over the winder, balanced by tail ropes hung beneath them so the rope weight is constant on each side. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Rope System

6 top-level lines as of r107431
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Head Rope mine-hoist-head-rope 4× 4 · part
2 Tail Rope mine-hoist-tail-rope 2× 2 · part
3 Rope Attachment mine-hoist-rope-attachment 4× 4 · part
4 Skip / Cage mine-hoist-conveyance 1× 1 · part
5 Counterweight mine-hoist-counterweight 1× 1 · part
6 Tension Equalizer mine-hoist-rope-tension-equalizer 1× 1 · part