BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Obstacle Elements

Assembly

Interchangeable modules, rings, bars, ropes, and platforms, suspended via cable or bolted connection. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Obstacle Elements parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Obstacle Elements parts diagram: 1 hanging rings, 2 bar assembly, 3 rope assembly, 4 balance beam, 5 platform module. 6 parts in 5 top-level items.
Obstacle Elements parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Hanging Rings 1× Pair of gymnastics rings on chain or cable
2 Bar Assembly 1× Horizontal bar (pull-up bar style) on mounts
3 Rope Assembly 2× Climbing ropes or knotted ropes on hardware
4 Balance Beam 1× Narrow beam or plank for foot precision
5 Platform Module 1× Adjustable platform for obstacle staging

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Obstacle Elements

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Hanging Rings ninja-course-system-hanging-rings 1× 1 · part
2 Bar Assembly ninja-course-system-bar-assembly 1× 1 · part
3 Rope Assembly ninja-course-system-rope-assembly 2× 2 · part
4 Balance Beam ninja-course-system-balance-beam 1× 1 · part
5 Platform Module ninja-course-system-platform-module 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the obstacle elements is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks