BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Bridge Truss

Assembly

The long lattice span that carries the conveyor across the open pit between the digging and spoil sides. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bridge Truss parts and their functions

5 top-level parts · 107 parts in total · full bill of materials below
Bridge Truss parts diagram: 1 main chord, 2 lattice diagonal, 3 node gusset, 4 inspection walkway, 5 fastener set. 107 parts in 5 top-level items.
Bridge Truss parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Main Chord 4× Main chords
2 Lattice Diagonal 40× Lattice diagonals
3 Node Gusset 60× Node gussets
4 Inspection Walkway 2× Inspection walkways
5 Fastener Set 1× Field bolting

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Bridge Truss

5 top-level lines · 5 rows shown · 107 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Chord overburden-conveyor-bridge-chord 4× 4 · part
2 Lattice Diagonal overburden-conveyor-bridge-diagonal 40× 40 · part
3 Node Gusset overburden-conveyor-bridge-node-gusset 60× 60 · part
4 Inspection Walkway overburden-conveyor-bridge-walkway 2× 2 · part
5 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the bridge truss is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks