BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Payout System

Assembly

Ball collection tray, counter tubes, and motor-driven coin dispensing. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Payout System parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Payout System parts diagram: 1 collection tray, 2 ball counter sensor, 3 coin hopper, 4 blower motor, 5 connector. 6 parts in 5 top-level items.
Payout System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Collection Tray 1× Removable ball catch basin
2 Ball Counter Sensor 1× Optical sensor counting landed balls
3 Coin Hopper 1× Motor-driven coin dispenser
4 Blower Motor 1× Hopper motor
5 Connector 2× Counter and hopper harnesses

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Payout System

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Collection Tray pachinko-machine-collection-tray 1× 1 · part
2 Ball Counter Sensor pachinko-machine-ball-counter 1× 1 · part
3 Coin Hopper pachinko-machine-coin-hopper 1× 1 · part
4 Blower Motor blower-motor 1× 1 · part
5 Connector connector 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the payout system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks