Process Water System

Assembly

The tanks and pumps that recover thickener overflow and supply the trim water that sets final paste slump. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Process Water System

4 top-level lines as of r122519
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Process Water Tank paste-backfill-plant-water-tank 1× 1 · part
2 Water Pump 5 parts paste-backfill-plant-water-pump 1× 1 0 assembly
3 Trim Water Valve paste-backfill-plant-trim-valve 1× 1 · part
4 Flow Meter paste-backfill-plant-flow-meter 1× 1 · part