BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Track System

Assembly

Segmented rubber-metal track chain with steel sprocket drive. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Track System parts and their functions

4 top-level parts · 45 parts in total · full bill of materials below
Track System parts diagram: 1 track links, 2 idler wheel, 3 drive sprocket, 4 fastener set. 45 parts in 4 top-level items.
Track System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Track Links 40× Rubber pads on metal pins
2 Idler Wheel 2× Aluminum wheels on each side tensioning track
3 Drive Sprocket 2× Toothed drive sprockets on motor gearbox
4 Fastener Set 1× Cotter pins and lock rings for wheel retention

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Track System

4 top-level lines · 4 rows shown · 45 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Track Links rc-tank-track-links 40× 40 · part
2 Idler Wheel rc-tank-idler-wheel 2× 2 · part
3 Drive Sprocket rc-tank-sprocket 2× 2 · part
4 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the track system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks