BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Personnel Platform

Assembly

Elevated work platform with railings and step ladder for roof installation access. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Personnel Platform parts and their functions

6 top-level parts · 8 parts in total · full bill of materials below
Personnel Platform parts diagram: 1 basket frame, 2 basket floor, 3 safety railing, 4 step ladder, 5 tool rack, 6 sheet metal panel. 8 parts in 6 top-level items.
Personnel Platform parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Basket Frame 1× Welded steel cage structure
2 Basket Floor 1× Expanded metal decking
3 Safety Railing 2× Top and mid-level safety rails
4 Step Ladder 1× Fixed stairs or rungs
5 Tool Rack 1× Pegboard for tool storage
6 Sheet Metal Panel 2× Protective shrouds from rotating machinery

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Personnel Platform

6 top-level lines · 6 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Basket Frame rock-bolter-basket-frame 1× 1 · part
2 Basket Floor rock-bolter-basket-floor 1× 1 · part
3 Safety Railing rock-bolter-railing 2× 2 · part
4 Step Ladder rock-bolter-step-ladder 1× 1 · part
5 Tool Rack rock-bolter-tool-rack 1× 1 · part
6 Sheet Metal Panel sheet-panel 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the personnel platform is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks