BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Tank Basin

Assembly

Large settling chamber designed to slow flow velocity and allow sand to settle. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Tank Basin parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Tank Basin parts diagram: 1 tank walls, 2 tank floor, 3 inlet hopper, 4 internal baffle, 5 sheet metal panel. 6 parts in 5 top-level items.
Tank Basin parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Tank Walls 1× Concrete side walls or steel plate construction
2 Tank Floor 1× Sloped concrete or steel bottom draining to center
3 Inlet Hopper 1× Distribution box feeding slurry into tank
4 Internal Baffle 1× Internal weir reducing turbulence
5 Sheet Metal Panel 2× Cover or access hatches

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Tank Basin

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Tank Walls sand-classifying-tank-basin-wall 1× 1 · part
2 Tank Floor sand-classifying-tank-basin-floor 1× 1 · part
3 Inlet Hopper sand-classifying-tank-inlet-hopper 1× 1 · part
4 Internal Baffle sand-classifying-tank-baffle 1× 1 · part
5 Sheet Metal Panel sheet-panel 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the tank basin is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks