BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r153188 of this page, not the current version. Go to current · history

Operator Control Station

Assembly

Sheltered post where the crew positions and runs the booms. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Operator Control Station

6 top-level lines as of r153188
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Control Console 4 parts shaft-sinking-jumbo-control-console 1× 1 0 assembly
2 Control Joystick shaft-sinking-jumbo-joystick 4× 4 · part
3 Falling-Object Canopy shaft-sinking-jumbo-canopy 1× 1 · part
4 LCD Panel lcd-panel 1× 1 · part
5 Relay relay 8× 8 · part
6 Wire Bundle wire-bundle 1× 1 · part