BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items

You are viewing r163050 of this page, not the current version. Go to current · history

Operator Cab

Assembly

The cab where the operator runs slew, luffing, travel, and the belt to build the spoil pile. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Bill of materials for Operator Cab

4 top-level lines as of r163050
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cab Shell spreader-stacker-mining-cab-shell 1× 1 · part
2 Operator Seat spreader-stacker-mining-seat 1× 1 · part
3 Joystick spreader-stacker-mining-joystick 2× 2 · part
4 LCD Panel lcd-panel 2× 2 · part