BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Control and Instrumentation

Assembly

The PLC, sensors and motor starters that interlock the lube and feed, watch vibration and bearing temperature, and protect the rotor. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Control and Instrumentation parts and their functions

6 top-level parts · 24 parts in total · full bill of materials below
Control and Instrumentation parts diagram: 1 PLC controller, 2 motor starter, 3 vibration sensor, 4 bearing temperature sensor, 5 wire bundle, 6 connector. 24 parts in 6 top-level items.
Control and Instrumentation parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 PLC Controller 5 parts 1× PLC controller
2 Motor Starter 2 parts 2× Motor starters
3 Vibration Sensor 2× Vibration sensors
4 Bearing Temperature Sensor 2× Bearing temperature sensors
5 Wire Bundle 1× Control harness
6 Connector 8× Panel connectors

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Control and Instrumentation

6 top-level lines · 13 rows shown · 24 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 PLC Controller 5 parts vsi-crusher-plc 1× 1 5 assembly
1.1 Bare PCB pcb-bare 1× 1 · part
1.2 Microcontroller mcu 1× 1 · part
1.3 SMD Passive (R/C/L) smd-passives 1× 1 · part
1.4 LCD Panel lcd-panel 1× 1 · part
1.5 Power Supply power-supply 1× 1 · part
2 Motor Starter 2 parts vsi-crusher-motor-starter 2× 2 3 assembly
2.1 Relay relay 2× 4 · part
2.2 Contactor vsi-crusher-contactor 1× 2 · part
3 Vibration Sensor vsi-crusher-vibration-sensor 2× 2 · part
4 Bearing Temperature Sensor vsi-crusher-temp-sensor 2× 2 · part
5 Wire Bundle wire-bundle 1× 1 · part
6 Connector connector 8× 8 · part

Something wrong in this list? Report a problem with this BOM.

Where the control and instrumentation is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks