BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Access Stair Tower

Assembly

The climb: a galvanised stair tower with non-slip treads, handrails, intermediate landings for queueing, and a start platform at the flume entry. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Access Stair Tower parts and their functions

5 top-level parts · 14 parts in total · full bill of materials below
Access Stair Tower parts diagram: 1 stair flight, 2 queue landing, 3 handrail run, 4 start platform, 5 tower frame. 14 parts in 5 top-level items.
Access Stair Tower parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Stair Flight 6× Stair flights
2 Queue Landing 5× Queue landings
3 Handrail Run 1× Continuous handrails
4 Start Platform 1× Top dispatch platform
5 Tower Frame 1× Tower steel frame

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Access Stair Tower

5 top-level lines · 5 rows shown · 14 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Stair Flight water-slide-stair-flight 6× 6 · part
2 Queue Landing water-slide-landing 5× 5 · part
3 Handrail Run water-slide-handrail-run 1× 1 · part
4 Start Platform water-slide-start-platform 1× 1 · part
5 Tower Frame water-slide-tower-frame 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the access stair tower is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks