Out-of-Pit Conveyor
AssemblyThe overland and inclined belt that carries crushed ore up the pit wall to the surface. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Out-of-Pit Conveyor parts and their functions
6 top-level parts · 7,513 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Conveyor Belt | 1× | Conveyor belt |
| 2 | Carrying Idler 2 parts | 800× | Carrying idlers |
| 3 | Return Idler | 300× | Return idlers |
| 4 | Drive Station 5 parts | 2× | Drive stations |
| 5 | Belt Take-Up | 1× | Belt take-up |
| 6 | Pulley Set | 1× | Pulley set |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Out-of-Pit Conveyor
6 top-level lines · 13 rows shown · 7,513 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Conveyor Belt | in-pit-crusher-conveyor-belt | 1× | 1 | · | part |
| 2 | Carrying Idler 2 parts | in-pit-crusher-conveyor-carry-idler | 800× | 800 | 9 | assembly |
| 2.1 | Idler Roll | in-pit-crusher-conveyor-idler-roll | 3× | 2,400 | · | part |
| 2.2 | Ball Bearing | ball-bearing | 6× | 4,800 | · | part |
| 3 | Return Idler | in-pit-crusher-conveyor-return-idler | 300× | 300 | · | part |
| 4 | Drive Station 5 parts | in-pit-crusher-conveyor-drive-station | 2× | 2 | 5 | assembly |
| 4.1 | Belt Motor | in-pit-crusher-conveyor-belt-motor | 1× | 2 | · | part |
| 4.2 | Gearbox Housing | gearbox-housing | 1× | 2 | · | part |
| 4.3 | Helical Gear Pair | gear-pair | 1× | 2 | · | part |
| 4.4 | Drive Pulley | in-pit-crusher-conveyor-drive-pulley | 1× | 2 | · | part |
| 4.5 | Backstop | in-pit-crusher-conveyor-backstop | 1× | 2 | · | part |
| 5 | Belt Take-Up | in-pit-crusher-conveyor-takeup | 1× | 1 | · | part |
| 6 | Pulley Set | in-pit-crusher-conveyor-pulley-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the out-of-pit conveyor is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |