BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Discharge Mechanism

Assembly

Bottom-dump or arc door released by dump scrolls as the skip runs into the discharge curve at the headframe. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Discharge Mechanism parts and their functions

8 top-level parts · 17 parts in total · full bill of materials below
Discharge Mechanism parts diagram: 1 bottom dump door, 2 dump scroll track, 3 door roller, 4 door latch, 5 door hinge, 6 latch spring, 7 coil spring, 8 ball bearing. 17 parts in 8 top-level items.
Discharge Mechanism parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Bottom Dump Door 1× Bottom arc door swinging open to release the ore into the bin
2 Dump Scroll Track 2× Curved scroll tracks at the headframe forcing the door open at the tip point
3 Door Roller 4× Rollers on the door arms following the dump scrolls
4 Door Latch 1× Latch holding the door shut while the skip is loaded and hoisting
5 Door Hinge 2× Hinges carrying the door and its ore load
6 Latch Spring 1× Spring keeping the latch engaged against vibration
7 Coil Spring 2× Return springs reseating the door after discharge
8 Ball Bearing 4× Sealed bearings in the door rollers

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Discharge Mechanism

8 top-level lines · 8 rows shown · 17 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Bottom Dump Door mine-skip-dump-door 1× 1 · part
2 Dump Scroll Track mine-skip-dump-scroll 2× 2 · part
3 Door Roller mine-skip-door-roller 4× 4 · part
4 Door Latch mine-skip-door-latch 1× 1 · part
5 Door Hinge mine-skip-door-hinge 2× 2 · part
6 Latch Spring mine-skip-latch-spring 1× 1 · part
7 Coil Spring coil-spring 2× 2 · part
8 Ball Bearing ball-bearing 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the discharge mechanism is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks