BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Concrete Piston Pump

Assembly

Twin-cylinder piston pump that pushes wet concrete to the nozzle through a swing valve. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Concrete Piston Pump parts and their functions

7 top-level parts · 30 parts in total · full bill of materials below
Concrete Piston Pump parts diagram: 1 concrete hopper, 2 material delivery cylinder, 3 hydraulic drive cylinder, 4 s-tube swing valve, 5 wear plate & cutting ring, 6 delivery pipe & hose, 7 pressure sensor. 30 parts in 7 top-level items.
Concrete Piston Pump parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Concrete Hopper 3 parts 1× Receiving hopper with an agitator that keeps the mix from segregating.
2 Material Delivery Cylinder 2× Cylinder that the concrete piston draws into and pushes out of.
3 Hydraulic Drive Cylinder 5 parts 2×
4 S-Tube Swing Valve 1× S-shaped tube that alternates which delivery cylinder feeds the outlet.
5 Wear Plate & Cutting Ring 1×
6 Delivery Pipe & Hose 1×
7 Pressure Sensor 2× Transduces fluid or gas pressure into an electrical signal.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Concrete Piston Pump

7 top-level lines · 19 rows shown · 30 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Concrete Hopper 3 parts shotcrete-sprayer-mining-hopper 1× 1 11 assembly
1.1 Hopper Shell shotcrete-sprayer-mining-hopper-shell 1× 1 · part
1.2 Remixer Agitator 4 parts shotcrete-sprayer-mining-agitator 1× 1 9 assembly
1.2.1 Agitator Shaft shotcrete-sprayer-mining-agitator-shaft 1× 1 · part
1.2.2 Agitator Paddle shotcrete-sprayer-mining-agitator-paddle 4× 4 · part
1.2.3 Ball Bearing ball-bearing 2× 2 · part
1.2.4 Oil Seal oil-seal 2× 2 · part
1.3 Hopper Grate shotcrete-sprayer-mining-grate 1× 1 · part
2 Material Delivery Cylinder shotcrete-sprayer-mining-delivery-cylinder 2× 2 · part
3 Hydraulic Drive Cylinder 5 parts shotcrete-sprayer-mining-drive-cylinder 2× 2 6 assembly
3.1 Cylinder Tube shotcrete-sprayer-mining-cyl-tube 1× 2 · part
3.2 Cylinder Rod shotcrete-sprayer-mining-cyl-rod 1× 2 · part
3.3 Cylinder Piston shotcrete-sprayer-mining-cyl-piston 1× 2 · part
3.4 O-Ring Set oring-set 1× 2 · part
3.5 Oil Seal oil-seal 2× 4 · part
4 S-Tube Swing Valve shotcrete-sprayer-mining-s-tube 1× 1 · part
5 Wear Plate & Cutting Ring shotcrete-sprayer-mining-wear-plate 1× 1 · part
6 Delivery Pipe & Hose shotcrete-sprayer-mining-delivery-pipe 1× 1 · part
7 Pressure Sensor pressure-sensor 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the concrete piston pump is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Kirloskar
kbl.co.in ↗
Pune, IN Pumps & fluid systems 200 units 6–10 wks
🇨🇳Leo Group
leo.com.cn ↗
Taizhou, CN Pumps 200 units 6–10 wks
🇮🇳Shakti Pumps
shaktipumps.com ↗
Pithampur, IN Pumps 200 units 6–10 wks
🇨🇳CNP Pumps
cnppumps.com ↗
Hangzhou, CN Pumps 200 units 6–10 wks
🇮🇳Roto Pumps
rotopumps.com ↗
Noida, IN Pumps 200 units 6–10 wks