Discharge Boom
AssemblyThe long cantilever boom and belt that reach out over the spoil pile and discharge the overburden. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Discharge Boom parts and their functions
5 top-level parts · 247 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Discharge Truss | 1× | Discharge truss |
| 2 | Discharge Belt | 1× | Discharge belt |
| 3 | Belt Drive Station 4 parts | 1× | Belt drive station |
| 4 | Discharge Chute | 1× | Discharge chute |
| 5 | Idler Set 3 parts | 1× | Idler set |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Discharge Boom
5 top-level lines · 12 rows shown · 247 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Discharge Truss | spreader-stacker-mining-discharge-truss | 1× | 1 | · | part |
| 2 | Discharge Belt | spreader-stacker-mining-discharge-belt | 1× | 1 | · | part |
| 3 | Belt Drive Station 4 parts | spreader-stacker-mining-discharge-drive | 1× | 1 | 4 | assembly |
| 3.1 | Belt Motor | spreader-stacker-mining-belt-motor | 1× | 1 | · | part |
| 3.2 | Gearbox Housing | gearbox-housing | 1× | 1 | · | part |
| 3.3 | Helical Gear Pair | gear-pair | 1× | 1 | · | part |
| 3.4 | Drive Pulley | spreader-stacker-mining-drive-pulley | 1× | 1 | · | part |
| 4 | Discharge Chute | spreader-stacker-mining-discharge-chute | 1× | 1 | · | part |
| 5 | Idler Set 3 parts | spreader-stacker-mining-idler-set | 1× | 1 | 240 | assembly |
| 5.1 | Trough Idler | spreader-stacker-mining-trough-idler | 60× | 60 | · | part |
| 5.2 | Return Idler | spreader-stacker-mining-return-idler | 20× | 20 | · | part |
| 5.3 | Ball Bearing | ball-bearing | 160× | 160 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the discharge boom is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |