BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Receiving Boom

Assembly

The boom and belt that take feed from a conveyor bridge or hopper car onto the spreader. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Receiving Boom parts and their functions

4 top-level parts · 243 parts in total · full bill of materials below
Receiving Boom parts diagram: 1 receiving truss, 2 receiving belt, 3 receiving hopper, 4 idler set. 243 parts in 4 top-level items.
Receiving Boom parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Receiving Truss 1× Receiving truss
2 Receiving Belt 1× Receiving belt
3 Receiving Hopper 1× Receiving hopper
4 Idler Set 3 parts 1× Idler set

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Receiving Boom

4 top-level lines · 7 rows shown · 243 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Receiving Truss spreader-stacker-mining-receiving-truss 1× 1 · part
2 Receiving Belt spreader-stacker-mining-receiving-belt 1× 1 · part
3 Receiving Hopper spreader-stacker-mining-receiving-hopper 1× 1 · part
4 Idler Set 3 parts spreader-stacker-mining-idler-set 1× 1 240 assembly
4.1 Trough Idler spreader-stacker-mining-trough-idler 60× 60 · part
4.2 Return Idler spreader-stacker-mining-return-idler 20× 20 · part
4.3 Ball Bearing ball-bearing 160× 160 · part

Something wrong in this list? Report a problem with this BOM.

Where the receiving boom is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks