Timer & Control Panel
AssemblyThermostat, function selector and timer that set temperature, element combination and cook duration. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Timer & Control Panel parts and their functions
5 top-level parts · 7 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Cavity Thermostat | 1× | Capillary-bulb or bimetal thermostat adjustable from about 90 to 230 degrees C that cycles the elements. |
| 2 | Function Switch | 1× | Rotary cam switch that routes power to upper elements, lower elements, both, and the convection fan. |
| 3 | Mechanical Timer | 1× | Spring-wound 60-minute timer that switches the oven off and rings a bell at zero. |
| 4 | Control Knob | 3× | Molded knob with pointer for the thermostat, function and timer shafts. |
| 5 | Indicator Lamp | 1× | Neon lamp showing the elements are powered. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Timer & Control Panel
5 top-level lines · 5 rows shown · 7 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Cavity Thermostat | countertop-oven-thermostat | 1× | 1 | · | part |
| 2 | Function Switch | countertop-oven-function-switch | 1× | 1 | · | part |
| 3 | Mechanical Timer | countertop-oven-timer | 1× | 1 | · | part |
| 4 | Control Knob | countertop-oven-knob | 3× | 3 | · | part |
| 5 | Indicator Lamp | countertop-oven-indicator-lamp | 1× | 1 | · | part |
Where the timer & control panel is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |