BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Mixing Chamber

Assembly

Bowl and paddle that fold flour and water into a crumbly dough before extrusion. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Mixing Chamber parts and their functions

5 top-level parts · 6 parts in total · full bill of materials below
Mixing Chamber parts diagram: 1 mixing bowl, 2 mixing paddle, 3 paddle coupler, 4 bowl seal, 5 wall scraper. 6 parts in 5 top-level items.
Mixing Chamber parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Mixing Bowl 1× Removable mixing bowl
2 Mixing Paddle 1× Dual mixing paddle
3 Paddle Coupler 1× Paddle drive coupler
4 Bowl Seal 1× Bowl base seal
5 Wall Scraper 2× Wall scraper fins

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Mixing Chamber

5 top-level lines · 5 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Mixing Bowl electric-pasta-machine-mix-bowl 1× 1 · part
2 Mixing Paddle electric-pasta-machine-paddle 1× 1 · part
3 Paddle Coupler electric-pasta-machine-paddle-coupler 1× 1 · part
4 Bowl Seal electric-pasta-machine-bowl-seal 1× 1 · part
5 Wall Scraper electric-pasta-machine-scraper 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the mixing chamber is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks