Main Control Module
AssemblyMicrocontroller managing compressor duty cycle, vacuum pump operation, shelf heating ramps, and drying timeline (typically 10–24 hours per batch). A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Main Control Module
4 top-level lines as of r83050| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Microcontroller | mcu | 1× | 1 | · | part |
| 2 | Relay | relay | 3× | 3 | · | part |
| 3 | Bare PCB | pcb-bare | 1× | 1 | · | part |
| 4 | SMD Passive (R/C/L) | smd-passives | 1× | 1 | · | part |