Freezer Bowl or Compressor Chamber
AssemblyDouble-walled stainless-steel or aluminum bowl (1–2 L capacity) pre-filled with freezing gel, or compressor-cooled chamber maintaining -10 to -20 °C. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Freezer Bowl or Compressor Chamber parts and their functions
5 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Outer Bowl Shell | 1× | Outer stainless-steel shell |
| 2 | Inner Bowl Surface | 1× | Inner aluminum or steel bowl |
| 3 | Freezing Gel or Refrigerant Charge | 1× | Heat-absorbing gel or refrigerant |
| 4 | O-Ring Set | 1× | Seals between bowl layers |
| 5 | Connector | 1× | Paddle shaft interface |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Freezer Bowl or Compressor Chamber
5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Outer Bowl Shell | home-ice-cream-maker-bowl-outer | 1× | 1 | · | part |
| 2 | Inner Bowl Surface | home-ice-cream-maker-bowl-inner | 1× | 1 | · | part |
| 3 | Freezing Gel or Refrigerant Charge | home-ice-cream-maker-freeze-gel | 1× | 1 | · | part |
| 4 | O-Ring Set | oring-set | 1× | 1 | · | part |
| 5 | Connector | connector | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the freezer bowl or compressor chamber is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $5–$2k. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| kbl.co.in ↗ | Pune, IN | Pumps & fluid systems | 200 units | 6–10 wks |
| leo.com.cn ↗ | Taizhou, CN | Pumps | 200 units | 6–10 wks |
| shaktipumps.com ↗ | Pithampur, IN | Pumps | 200 units | 6–10 wks |
| cnppumps.com ↗ | Hangzhou, CN | Pumps | 200 units | 6–10 wks |
| rotopumps.com ↗ | Noida, IN | Pumps | 200 units | 6–10 wks |