Cup Set
AssemblyTwo travel cups with lids, lip rings, and handles. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cup Set parts and their functions
5 top-level parts · 14 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Travel Cup | 2× | 0.5-0.7 L Tritan copolyester cup, threaded both ends. |
| 2 | Sip Lid 3 parts | 2× | Snap lid with a flip spout. |
| 3 | Comfort Lip Ring | 2× | Soft-touch drinking rim that clips on the cup. |
| 4 | Cup Handle | 2× | Clip-on carry handle. |
| 5 | Cup Gasket | 2× | Seal between cup rim and blade base. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cup Set
5 top-level lines · 8 rows shown · 14 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Travel Cup | personal-blender-travel-cup | 2× | 2 | · | part |
| 2 | Sip Lid 3 parts | personal-blender-sip-lid | 2× | 2 | 3 | assembly |
| 2.1 | Lid Body | personal-blender-lid-body | 1× | 2 | · | part |
| 2.2 | Flip Spout | personal-blender-flip-spout | 1× | 2 | · | part |
| 2.3 | O-Ring Set | oring-set | 1× | 2 | · | part |
| 3 | Comfort Lip Ring | personal-blender-lip-ring | 2× | 2 | · | part |
| 4 | Cup Handle | personal-blender-cup-handle | 2× | 2 | · | part |
| 5 | Cup Gasket | personal-blender-cup-gasket | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the cup set is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |