Sensor Assembly
AssemblyMagnetic spring thermostat under the pot, a center thermistor and a lid temperature sensor feeding the fuzzy-logic loop. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Sensor Assembly parts and their functions
3 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Magnetic Spring Thermostat 3 parts | 1× | Spring-loaded Curie-point thermostat |
| 2 | Center Thermistor (NTC) | 1× | Center bottom thermistor |
| 3 | Lid Temperature Sensor | 1× | Lid temperature sensor |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Sensor Assembly
3 top-level lines · 6 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Magnetic Spring Thermostat 3 parts | rice-cooker-magnetic-thermostat | 1× | 1 | 3 | assembly |
| 1.1 | Curie-Point Magnet | rice-cooker-curie-magnet | 1× | 1 | · | part |
| 1.2 | Coil Spring | coil-spring | 1× | 1 | · | part |
| 1.3 | Thermostat Housing | rice-cooker-thermostat-housing | 1× | 1 | · | part |
| 2 | Center Thermistor (NTC) | rice-cooker-center-thermistor | 1× | 1 | · | part |
| 3 | Lid Temperature Sensor | rice-cooker-lid-sensor | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the sensor assembly is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$80. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| sunnyoptical.com ↗ | Ningbo, CN | Optics & camera modules | 1,000 pcs | 8–12 wks |
|
🇨🇳OFILM
ofilm.com ↗
|
Shenzhen, CN | Camera modules | 1,000 pcs | 8–12 wks |
| vvdntech.com ↗ | Gurugram, IN | Electronics & camera modules | 1,000 pcs | 8–12 wks |
| truly.net ↗ | Shanwei, CN | Displays & camera modules | 1,000 pcs | 8–12 wks |
| aactechnologies.com ↗ | Singapore | Acoustics & optics | 1,000 pcs | 8–12 wks |