BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Base and Pedestal

Assembly

The weighted base and upright pedestal that carry the head and keep the mixer from walking. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Base and Pedestal parts and their functions

6 top-level parts · 9 parts in total · full bill of materials below
Base and Pedestal parts diagram: 1 base casting, 2 pedestal column, 3 trim band, 4 foot, 5 sheet metal panel, 6 fastener set. 9 parts in 6 top-level items.
Base and Pedestal parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Base Casting 1× Base casting
2 Pedestal Column 1× Pedestal column
3 Trim Band 1× Decorative trim band
4 Foot 4× Suction or rubber feet
5 Sheet Metal Panel 1× Bottom plate
6 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Base and Pedestal

6 top-level lines · 6 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Base Casting stand-mixer-tilt-head-base-casting 1× 1 · part
2 Pedestal Column stand-mixer-tilt-head-pedestal 1× 1 · part
3 Trim Band stand-mixer-tilt-head-trim-band 1× 1 · part
4 Foot stand-mixer-tilt-head-foot 4× 4 · part
5 Sheet Metal Panel sheet-panel 1× 1 · part
6 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the base and pedestal is used

2 products across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks