BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Pneumatic Carrier Tube Network

Assembly

A pressurized or vacuum-powered tube system that transports capsules containing documents, envelopes, and cards between the customer drive-up window and the teller station. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Pneumatic Carrier Tube Network parts and their functions

7 top-level parts · 41 parts in total · full bill of materials below
Pneumatic Carrier Tube Network parts diagram: 1 main blower, 2 tube main, 3 tube branches, 4 tube junction valve, 5 tube elbow fittings, 6 tube support bracket, 7 fastener set. 41 parts in 7 top-level items.
Pneumatic Carrier Tube Network parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Main Blower 1× Centrifugal blower, 1–2 HP, 120/240 VAC, generates 6–12 inch water column pressure or vacuum
2 Tube Main 1× HDPE or aluminum main trunk, 3–4 inch ID, runs from customer station to teller area, 20–40 feet length
3 Tube Branches 4× 2–3 inch ID branch tubing, one per service lane, connects main trunk to customer pickup window and teller station
4 Tube Junction Valve 4× Solenoid-controlled switching valves route capsules to correct destination (teller inbox vs. customer pickup)
5 Tube Elbow Fittings 20× Smooth bend fittings prevent capsule jams in corners, designed for rapid flow transitions
6 Tube Support Bracket 10× Mounting clamps and vibration isolation suspends tube runs securely to building structure
7 Fastener Set 1× Bolts, clamps, sealant for tube connections and building anchors

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Pneumatic Carrier Tube Network

7 top-level lines · 7 rows shown · 41 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Blower drive-through-teller-unit-main-blower 1× 1 · part
2 Tube Main drive-through-teller-unit-tube-main 1× 1 · part
3 Tube Branches drive-through-teller-unit-tube-branches 4× 4 · part
4 Tube Junction Valve drive-through-teller-unit-tube-junction-valve 4× 4 · part
5 Tube Elbow Fittings drive-through-teller-unit-tube-elbow-fittings 20× 20 · part
6 Tube Support Bracket drive-through-teller-unit-tube-support-bracket 10× 10 · part
7 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the pneumatic carrier tube network is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks