BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Drying Tube Assembly

Assembly

Bundle of flexible or rigid tubes that distribute warm air into multiple boot pairs simultaneously. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Drying Tube Assembly parts and their functions

4 top-level parts · 10 parts in total · full bill of materials below
Drying Tube Assembly parts diagram: 1 drying tube, 2 tube connector manifold, 3 tube splitter, 4 boot insertion nozzle. 10 parts in 4 top-level items.
Drying Tube Assembly parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Drying Tube 4× Flexible plastic or fabric tubes (0.5–1.0 m each)
2 Tube Connector Manifold 1× Manifold junction block
3 Tube Splitter 1× Y or T-junction divider
4 Boot Insertion Nozzle 4× Contoured nozzle insert for boot opening

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Drying Tube Assembly

4 top-level lines · 4 rows shown · 10 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Drying Tube boot-dryer-tube 4× 4 · part
2 Tube Connector Manifold boot-dryer-tube-connector 1× 1 · part
3 Tube Splitter boot-dryer-tube-splitter 1× 1 · part
4 Boot Insertion Nozzle boot-dryer-boot-nozzle 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the drying tube assembly is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks