BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Cheque Feed and Transport Mechanism

Assembly

A motorized system that reliably feeds cheques from a stack, advances them line-by-line during printing, and ejects completed cheques. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cheque Feed and Transport Mechanism parts and their functions

5 top-level parts · 9 parts in total · full bill of materials below
Cheque Feed and Transport Mechanism parts diagram: 1 feed system motor, 2 pickup roller, 3 transport roller pair, 4 ball bearing, 5 fastener set. 9 parts in 5 top-level items.
Cheque Feed and Transport Mechanism parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Feed System Motor 1× Stepper or DC motor for roller drive
2 Pickup Roller 1× Rubber roller that pulls cheques from the stack
3 Transport Roller Pair 2× Precision transport rollers advancing cheques
4 Ball Bearing 4× Motor and roller shaft bearings
5 Fastener Set 1× Feeder assembly mounting bolts

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cheque Feed and Transport Mechanism

5 top-level lines · 5 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Feed System Motor cheque-printer-feed-motor 1× 1 · part
2 Pickup Roller cheque-printer-pickup-roller 1× 1 · part
3 Transport Roller Pair cheque-printer-feed-rollers 2× 2 · part
4 Ball Bearing ball-bearing 4× 4 · part
5 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the cheque feed and transport mechanism is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks