BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Envelope Feeder

Assembly

Hopper that feeds one envelope at a time and a suction/mechanical opener that lifts the flap and throat for insertion. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Envelope Feeder parts and their functions

5 top-level parts · 7 parts in total · full bill of materials below
Envelope Feeder parts diagram: 1 envelope hopper, 2 envelope roller, 3 flap opener, 4 ball bearing, 5 envelope sensor. 7 parts in 5 top-level items.
Envelope Feeder parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Envelope Hopper 1× Stack hopper for envelopes
2 Envelope Roller 2× Feed rollers for envelopes
3 Flap Opener 1× Opens the envelope flap and throat
4 Ball Bearing 2× Roller bearings (reuse)
5 Envelope Sensor 1× Envelope present sensor

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Envelope Feeder

5 top-level lines · 5 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Envelope Hopper fi-envelope-hopper 1× 1 · part
2 Envelope Roller fi-envelope-roller 2× 2 · part
3 Flap Opener fi-flap-opener 1× 1 · part
4 Ball Bearing ball-bearing 2× 2 · part
5 Envelope Sensor fi-envelope-sensor 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the envelope feeder is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks