BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Steam System

Assembly

Boiler generating steam for garment pressing and drying on the form. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Steam System parts and their functions

5 top-level parts · 10 parts in total · full bill of materials below
Steam System parts diagram: 1 steam boiler, 2 steam manifold, 3 steam jet nozzle, 4 condensate trap, 5 safety relief valve. 10 parts in 5 top-level items.
Steam System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Steam Boiler 1× 6 kW electric boiler 15 L capacity
2 Steam Manifold 1× Three-port steam distribution manifold
3 Steam Jet Nozzle 6× Adjustable jet nozzles directing steam onto garment
4 Condensate Trap 1× Thermostatic condensate drain trap
5 Safety Relief Valve 1× Steam pressure relief valve 2.0 bar

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Steam System

5 top-level lines · 5 rows shown · 10 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Steam Boiler form-finisher-steam-boiler 1× 1 · part
2 Steam Manifold form-finisher-steam-manifold 1× 1 · part
3 Steam Jet Nozzle form-finisher-steam-jets 6× 6 · part
4 Condensate Trap form-finisher-condensate-trap 1× 1 · part
5 Safety Relief Valve form-finisher-safety-valve 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the steam system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks