BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Water System

Assembly

The removable tank and feed path that supply water to the boiler during a continuous run. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Water System parts and their functions

8 top-level parts · 8 parts in total · full bill of materials below
Water System parts diagram: 1 water tank, 2 tank cap, 3 fill valve, 4 water float, 5 low-water sensor, 6 intake hose, 7 anti-drip valve, 8 o-ring set. 8 parts in 8 top-level items.
Water System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Water Tank 1× Removable water tank
2 Tank Cap 1× Tank cap and valve
3 Fill Valve 1× Boiler fill valve
4 Water Float 1× Water level float
5 Low-Water Sensor 1× Low-water sensor
6 Intake Hose 1× Tank-to-boiler hose
7 Anti-Drip Valve 1× Anti-drip valve
8 O-Ring Set 1× Water-path seals

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Water System

8 top-level lines · 8 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Water Tank garment-steamer-standing-water-tank 1× 1 · part
2 Tank Cap garment-steamer-standing-tank-cap 1× 1 · part
3 Fill Valve garment-steamer-standing-fill-valve 1× 1 · part
4 Water Float garment-steamer-standing-float 1× 1 · part
5 Low-Water Sensor garment-steamer-standing-level-sensor 1× 1 · part
6 Intake Hose garment-steamer-standing-intake-hose 1× 1 · part
7 Anti-Drip Valve garment-steamer-standing-anti-drip 1× 1 · part
8 O-Ring Set oring-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the water system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks