Dispense System
AssemblyCouples the keg and pours beer through the tower faucet. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Dispense System parts and their functions
5 top-level parts · 11 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Keg Coupler 4 parts | 1× | Keg coupler (Sankey) |
| 2 | Beer Line | 1× | Beer line to the faucet |
| 3 | Draft Tower | 1× | Draft tower |
| 4 | Tap Faucet 3 parts | 1× | Tap faucet |
| 5 | Tap Handle | 1× |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Dispense System
5 top-level lines · 12 rows shown · 11 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Keg Coupler 4 parts | kegerator-coupler | 1× | 1 | 5 | assembly |
| 1.1 | Coupler Body | kegerator-coupler-body | 1× | 1 | · | part |
| 1.2 | Coupler Probe | kegerator-coupler-probe | 1× | 1 | · | part |
| 1.3 | Check Valve | kegerator-check-valve | 2× | 2 | · | part |
| 1.4 | O-Ring Set | oring-set | 1× | 1 | · | part |
| 2 | Beer Line | kegerator-beer-line | 1× | 1 | · | part |
| 3 | Draft Tower | kegerator-tower | 1× | 1 | · | part |
| 4 | Tap Faucet 3 parts | kegerator-faucet | 1× | 1 | 3 | assembly |
| 4.1 | Faucet Body | kegerator-faucet-body | 1× | 1 | · | part |
| 4.2 | Faucet Lever | kegerator-faucet-lever | 1× | 1 | · | part |
| 4.3 | O-Ring Set | oring-set | 1× | 1 | · | part |
| 5 | Tap Handle | kegerator-tap-handle | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the dispense system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |