BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Control Panel

Assembly

PLC with buttons and display for speed adjustment and fold mode selection. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Control Panel parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Control Panel parts diagram: 1 control PLC, 2 HMI display, 3 control buttons, 4 emergency stop contactor, 5 main power switch. 5 parts in 5 top-level items.
Control Panel parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Control PLC 1× Compact PLC 16 digital + 4 analog I/O
2 HMI Display 1× 7-inch HMI touchscreen
3 Control Buttons 1× Start/stop/speed control buttons
4 Emergency Stop Contactor 1× E-stop button with contactor
5 Main Power Switch 1× 30 A disconnect switch

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Control Panel

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Control PLC laundry-folding-machine-plc 1× 1 · part
2 HMI Display laundry-folding-machine-display 1× 1 · part
3 Control Buttons laundry-folding-machine-pushbutton-panel 1× 1 · part
4 Emergency Stop Contactor laundry-folding-machine-emergency-stop 1× 1 · part
5 Main Power Switch laundry-folding-machine-main-switch 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the control panel is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks