BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Ram & Press Plate

Assembly

The pressing stage: a flat steel platen on a yoke that the jack nuts drive down into the bag, with a stripper plate to peel the platen back off the compressed waste. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Ram & Press Plate parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Ram & Press Plate parts diagram: 1 press plate (platen), 2 ram yoke, 3 stripper plate, 4 fastener set. 4 parts in 4 top-level items.
Ram & Press Plate parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Press Plate (Platen) 1× Flat compaction platen
2 Ram Yoke 1× Cross-yoke linking the two nuts
3 Stripper Plate 1× Releases the platen from the trash
4 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Ram & Press Plate

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Press Plate (Platen) trash-compactor-press-plate 1× 1 · part
2 Ram Yoke trash-compactor-ram-yoke 1× 1 · part
3 Stripper Plate trash-compactor-stripper-plate 1× 1 · part
4 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the ram & press plate is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks