BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Electrical System

Assembly

Power cord, control board, and safety cutoffs. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Electrical System parts and their functions

6 top-level parts · 6 parts in total · full bill of materials below
Electrical System parts diagram: 1 mains power cord, 2 control panel, 3 temperature knob, 4 heating indicator, 5 connector, 6 fastener set. 6 parts in 6 top-level items.
Electrical System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Mains Power Cord 1× Heavy-duty 2–5 kW rated cord with industrial plug.
2 Control Panel 1× On/off switch with relay and safety interlock housing.
3 Temperature Knob 1× Rotary potentiometer adjusting thermostat setpoint.
4 Heating Indicator 1× LED showing when heater is actively warming.
5 Connector 1× Mating plug-and-socket pair that joins two lengths of wiring or a cable to a board so a circuit can be assembled, serviced, and separated without soldering.
6 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Electrical System

6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Mains Power Cord warming-trolley-power-cord 1× 1 · part
2 Control Panel warming-trolley-control-panel 1× 1 · part
3 Temperature Knob warming-trolley-thermostat-dial 1× 1 · part
4 Heating Indicator warming-trolley-indicator-light 1× 1 · part
5 Connector connector 1× 1 · part
6 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the electrical system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks