BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Seam Tracker

Assembly

Through-arc or laser tracking that follows the joint despite fit-up variation. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Seam Tracker parts and their functions

4 top-level parts · 100 parts in total · full bill of materials below
Seam Tracker parts diagram: 1 laser profile sensor, 2 tracker board, 3 touch-sense finder, 4 connector. 100 parts in 4 top-level items.
Seam Tracker parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Laser Profile Sensor 1× Laser profile sensor
2 Tracker Board 4 parts 1× Tracking processor
3 Touch-Sense Finder 1× Touch-sense start finder
4 Connector 2× Sensor connectors

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Seam Tracker

4 top-level lines · 8 rows shown · 100 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Laser Profile Sensor arc-welding-robot-laser-sensor 1× 1 · part
2 Tracker Board 4 parts arc-welding-robot-tracker-board 1× 1 96 assembly
2.1 Bare PCB pcb-bare 1× 1 · part
2.2 Microcontroller mcu 1× 1 · part
2.3 SMD Passive (R/C/L) smd-passives 90× 90 · part
2.4 Connector connector 4× 4 · part
3 Touch-Sense Finder arc-welding-robot-touch-sense 1× 1 · part
4 Connector connector 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the seam tracker is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks