BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Marker Suit

Assembly

Form-fitting nylon or spandex bodysuit with 45–60 retroreflective markers at joints and key points, enabling full-body skeletal tracking. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Marker Suit parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Marker Suit parts diagram: 1 body suit, 2 retroreflective marker, 3 head cap, 4 marker stickers, 5 fastener set. 5 parts in 5 top-level items.
Marker Suit parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Body Suit 1× Stretch nylon or spandex in XS–XXL sizes.
2 Retroreflective Marker 1× Forty to sixty markers
3 Head Cap 1× Nylon cap with pre-marked marker mounting points.
4 Marker Stickers 1× Adhesive-backed retroreflective discs for temporary placement.
5 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Marker Suit

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Body Suit motion-capture-system-suit-body 1× 1 · part
2 Retroreflective Marker motion-capture-system-marker 1× 1 · part
3 Head Cap motion-capture-system-head-cap 1× 1 · part
4 Marker Stickers motion-capture-system-marker-stickers 1× 1 · part
5 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the marker suit is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks