BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Frame Grabber & Synchronizer

Assembly

Dual LVDS receiver board with phase-locked frame trigger and timestamp FIFO per camera. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Frame Grabber & Synchronizer parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Frame Grabber & Synchronizer parts diagram: 1 spartan-6 FPGA board, 2 disciplined oscillator, 3 GPIO trigger module, 4 camera link fiber bridge. 4 parts in 4 top-level items.
Frame Grabber & Synchronizer parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Spartan-6 FPGA Board 1× Spartan-6 FPGA, 5× LVDS inputs, DDR3 frame buffer
2 Disciplined Oscillator 1× Disciplined oscillator 100 MHz, GNSS PPS input
3 GPIO Trigger Module 1× 5-channel GPIO frame trigger with <100ns skew
4 Camera Link Fiber Bridge 1× Camera interface breakout Camera Link over fiber

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Frame Grabber & Synchronizer

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Spartan-6 FPGA Board multispectral-survey-payload-fpga-grabber 1× 1 · part
2 Disciplined Oscillator multispectral-survey-payload-timestamp-osc 1× 1 · part
3 GPIO Trigger Module multispectral-survey-payload-trigger-gpio 1× 1 · part
4 Camera Link Fiber Bridge multispectral-survey-payload-connector-db 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the frame grabber & synchronizer is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks