Frame Grabber & Synchronizer
AssemblyDual LVDS receiver board with phase-locked frame trigger and timestamp FIFO per camera. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Frame Grabber & Synchronizer parts and their functions
4 top-level parts · 4 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Spartan-6 FPGA Board | 1× | Spartan-6 FPGA, 5× LVDS inputs, DDR3 frame buffer |
| 2 | Disciplined Oscillator | 1× | Disciplined oscillator 100 MHz, GNSS PPS input |
| 3 | GPIO Trigger Module | 1× | 5-channel GPIO frame trigger with <100ns skew |
| 4 | Camera Link Fiber Bridge | 1× | Camera interface breakout Camera Link over fiber |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Frame Grabber & Synchronizer
4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Spartan-6 FPGA Board | multispectral-survey-payload-fpga-grabber | 1× | 1 | · | part |
| 2 | Disciplined Oscillator | multispectral-survey-payload-timestamp-osc | 1× | 1 | · | part |
| 3 | GPIO Trigger Module | multispectral-survey-payload-trigger-gpio | 1× | 1 | · | part |
| 4 | Camera Link Fiber Bridge | multispectral-survey-payload-connector-db | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the frame grabber & synchronizer is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |