BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Fluid System

Assembly

Paint and solvent delivery: metering pump, regulator, hoses, and valves. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Fluid System parts and their functions

4 top-level parts · 33 parts in total · full bill of materials below
Fluid System parts diagram: 1 gear metering pump, 2 fluid regulator, 3 paint hose, 4 trigger valve. 33 parts in 4 top-level items.
Fluid System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Gear Metering Pump 3 parts 1× Paint metering pump
2 Fluid Regulator 1× Pressure regulator
3 Paint Hose 4× Paint/solvent hoses
4 Trigger Valve 2× Trigger valves

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Fluid System

4 top-level lines · 11 rows shown · 33 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Gear Metering Pump 3 parts painting-robot-gear-pump 1× 1 26 assembly
1.1 Helical Gear Pair gear-pair 1× 1 · part
1.2 Gearbox Housing gearbox-housing 1× 1 · part
1.3 Servo Motor 4 parts servo-motor 1× 1 24 assembly
1.3.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 1 3 assembly
1.3.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 1 19 assembly
1.3.3 Encoder encoder 1× 1 · part
1.3.4 Motor Housing motor-housing 1× 1 · part
2 Fluid Regulator painting-robot-fluid-regulator 1× 1 · part
3 Paint Hose painting-robot-paint-hose 4× 4 · part
4 Trigger Valve painting-robot-trigger-valve 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the fluid system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks