Press Synchronization
AssemblyInterface tying robot motion to the press ram so the tool clears the die before each stroke. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Press Synchronization parts and their functions
5 top-level parts · 91 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Crank Resolver | 1× | Press crank angle resolver |
| 2 | Sync Card 4 parts | 1× | Synchronization controller card |
| 3 | Clearance Sensor | 1× | Tool-clear confirmation sensor |
| 4 | Stroke Input | 1× | Press stroke and top-dead-center input |
| 5 | Connector | 2× | Interface connectors |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Press Synchronization
5 top-level lines · 9 rows shown · 91 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Crank Resolver | press-tending-robot-resolver | 1× | 1 | · | part |
| 2 | Sync Card 4 parts | press-tending-robot-sync-card | 1× | 1 | 86 | assembly |
| 2.1 | Bare PCB | pcb-bare | 1× | 1 | · | part |
| 2.2 | Microcontroller | mcu | 1× | 1 | · | part |
| 2.3 | SMD Passive (R/C/L) | smd-passives | 80× | 80 | · | part |
| 2.4 | Connector | connector | 4× | 4 | · | part |
| 3 | Clearance Sensor | press-tending-robot-clearance-sensor | 1× | 1 | · | part |
| 4 | Stroke Input | press-tending-robot-stroke-input | 1× | 1 | · | part |
| 5 | Connector | connector | 2× | 2 | · | part |
Where the press synchronization is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |