Timebase Generator
AssemblyRamp generator and sync separator producing horizontal sweep and trigger signals. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Timebase Generator parts and their functions
4 top-level parts · 18 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Ramp Generator IC | 1× | Precision integrator producing linear horizontal sweep. |
| 2 | Sync Separator | 1× | Peak detector extracting sync timing from video. |
| 3 | Timebase Adjustment | 1× | 10-turn potentiometer for variable sweep rate. |
| 4 | SMD Passive (R/C/L) | 15× | Surface-mount resistors, capacitors, and inductors, typically in 0402 to 1206 packages, that set voltages, filter noise, and time signals on a circuit board. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Timebase Generator
4 top-level lines · 4 rows shown · 18 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Ramp Generator IC | waveform-monitor-ramp-ic | 1× | 1 | · | part |
| 2 | Sync Separator | waveform-monitor-sync-separator | 1× | 1 | · | part |
| 3 | Timebase Adjustment | waveform-monitor-timebase-pot | 1× | 1 | · | part |
| 4 | SMD Passive (R/C/L) | smd-passives | 15× | 15 | · | part |
Where the timebase generator is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $2–$500. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Inovance
inovance.com ↗
|
Shenzhen, CN | Drives & motion control | 500 units | 10–14 wks |
| sonacomstar.com ↗ | Gurugram, IN | EV driveline & motors | 500 units | 10–14 wks |
| broad-ocean.com ↗ | Zhongshan, CN | Electric motors | 500 units | 10–14 wks |
| nidec.com ↗ | Singapore | Motors, regional ops | 500 units | 10–14 wks |
| bosch.in ↗ | Bengaluru, IN | Automotive components | 500 units | 10–14 wks |