Control System
AssemblyThe DCS holds amine circulation, reboiler duty and column levels at the values that meet the H2S sales spec while limiting corrosion and energy use. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Bill of materials for Control System
6 top-level lines as of r4028| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | DCS Marshalling Cabinet 4 parts | atu-dcs-cabinet | 1× | 1 | 0 | assembly |
| 2 | H2S Analyzer 4 parts | atu-h2s-analyzer | 1× | 1 | 0 | assembly |
| 3 | RTD Temperature Probe | temperature-rtd | 8× | 8 | · | part |
| 4 | Pressure Sensor | pressure-sensor | 6× | 6 | · | part |
| 5 | Power Supply | power-supply | 1× | 1 | · | part |
| 6 | Wire Bundle | wire-bundle | 1× | 1 | · | part |